Water Meter Test Systems - Recirculation Systems - Small


MARS Small Bench Recirculation System

MARS Recirculation Systems - Small

The MARS Recirculation System recycles the test water used on the MARS Test Bench System(s), maintaining volume and pressure to test all the meters at the recommended AWWA Specifications, per Table 5-3 of the current AWWA M6 Manual.

MARS Test Bench Systems are designed to meet / exceed American Water Works Association (AWWA) recommendations, National Institute for Standards and Technology (NIST) Handbook 44 Specifications, ISO Specifications and other standards and requirements.

Advantages of Recirculation Systems

account_balance

Compliance with local, state and/or Federal laws and regulations as it reduces the chemicals released into the environment

trending_down

An immediate reduction in consumption of test water

An immediate reduction in water dumped to waste after each test

Improved customer perception as the City sets an example for water conservation practices

Standard and Optional Features

Available on every configuration of MARS Small Bench Recirculation Systems.
* Denotes Optional Items, contact MARS for details.

Storage Tanks

Size dependent on configuration, as tanks and pumps can optionally service multiple benches.

Redundant Supply*

Offers the ability to use either city or recirculation for supply, making a redundant system (i.e., if one system is inoperable, the other can be used).

Reduced Usage

Utilizes a storage tank and system of pumps and VFD’s (if necessary) to recirculate water through the test bench, minimizing overall water use.  

Under normal conditions, municipal water is only used to fill recirculation tank and maintain sufficient water levels during operation.

Return Pumps*

Requires a return pump (unless re-circulation tank is below measurement tank) and pump to direct water from the measurement tank back to re-circulation tank

Ease of Maintenance*

Systems are equipped with filtration and chlorination to ensure clean test water.


Standard System Specifications

Specifications are subject to change at any time.  Please contact MARS for the latest specifications.

MARS Small Bench Recirculation System
MARS Small Bench Recirculation System
MARS Small Bench Recirculation System

Additional Recirculation System Specifications

 
Frame

Fabricated steel

Welded in accordance to standard industry practices and certifications

Coating

Polyester Coating in MARS Blue

Minimum of 20 years resistance to corrosion

High impact resistance

All steel is fully sandblasted and treated with Atochem rust proof primer before being coated for total bonding 

Frame is not touched by human hands within at least 2 hours of drying

Coating is applied using the electrostatic method, then placed in an oven at 495 degrees F until fully bonded 

The frame is electrostatically spark tested to detect defects

Tanks and Piping

Properly sized polyethylene or stainless steel tank (dependent on configuration)

All related piping and valves are included

Pumps

Supply pump(s) (one for each Small Meter Test Bench and two for each Large Bench)

Return pump(s), based on the number of test tanks within the system

The number of VFD’s is predicated on the number of supply pumps and Test Bench System within the configuration

VFD panel / enclosure

Chlorination System

Pump

Filtration System

Automatic timer


Is your Meter Shop Certified?

With MARS Maintenance Calibration Certification (MCC), you can protect both MARS and selected third-party equipment with technical assistance, software upgrades, preventative maintenance, spares management and on-site maintenance. Not only is the equipment upkeep essential, but ensuring all operators are fully trained on meter testing practices and procedures is critical.

MCC
MARS Small Bench Recirculation System

Learn More

Contact us today to learn more about Water Meter Test Systems.

Available Downloads:

MARS-Datasheet-TB-Recirculation.pdf
Popular 464.18 KB 85
30/08/2018 16:51:14
MARS-Datasheet-TB.pdf
Popular 488.9 KB 121
30/08/2018 16:19:23
MARS-PR-C715-Compliance.pdf
Popular 1.32 MB 20
23/10/2018 15:32:19
MARS-PR-C715UpgradeProgram-Nov-2018.pdf
Popular 1.33 MB 8
27/11/2018 00:00:00
MARS-PR-M3-Scale-Upgrade.pdf
Popular 1.35 MB 38
29/08/2018 01:36:47
MARS-PR-M3-Scale.pdf
Popular 604.02 KB 44
29/08/2018 04:53:44
MARS-PR-MCC.pdf
Popular 688.64 KB 47
29/08/2018 04:53:53
MARS-PR-TB-Patent-ULF.pdf
Popular 612.87 KB 37
29/08/2018 04:54:02
MARS-PR-TB-ULF-BF.pdf
Popular 632.89 KB 41
29/08/2018 04:54:10
MARS-PR-TestBenchPurchaseProtectionProgram-Nov-2018.pdf
Popular 1.32 MB 8
27/11/2018 00:00:00