Water Meter Test Systems - Test Spools and Racks


MARS Test Spools

Test Spools and Racks

Designed for use with MARS Large Water Meter Test Benches, MARS Test Spools and Storage Racks are built with the same high quality materials designed and configured to meet the testing needs of virtually any large meter management organization.

MARS Test Bench Systems are designed to meet / exceed American Water Works Association (AWWA) recommendations, National Institute for Standards and Technology (NIST) Handbook 44 Specifications, ISO Specifications and other standards and requirements.


Standard System Specifications

Specifications are subject to change at any time.  Please contact MARS for the latest specifications.

MARS Test Spools and Racks
MARS Test Spools and Racks

MARS Test Spools and Racks
MARS Test Spools and Racks

 
Frame

Fabricated steel

Welded in accordance to standard industry practices and certifications

Optional locking casters 

Coating

Polyester Coating in MARS Blue

Minimum of 20 years resistance to corrosion

High impact resistance

All steel is fully sandblasted and treated with Atochem rust proof primer before being coated for total bonding 

Frame is not touched by human hands within at least 2 hours of drying

Coating is applied using the electrostatic method, then placed in an oven at 495 degrees F until fully bonded 

The frame is electrostatically spark tested to detect defects

Spools

Provided in all sizes relevant to test bench size parameters

Coated inside and out according to above specifications

Optionally Equipped with alignment spacer flanges

Constructed of Sch. 40 steel pipe with 1D flanges welded at both ends

Modified to accept O-Rings using square groove technology on reducing spools and spacer flanges

Stainless alignment pins are uncoated 316 stainless steel

Equipped with lifting handle for ease of movement and safety


Is your Meter Shop Certified?

With MARS Maintenance Calibration Certification (MCC), you can protect both MARS and selected third-party equipment with technical assistance, software upgrades, preventative maintenance, spares management and on-site maintenance. Not only is the equipment upkeep essential, but ensuring all operators are fully trained on meter testing practices and procedures is critical.

MCC
MARS Test Spools and Racks

Learn More

Contact us today to learn more about Water Meter Test Systems.

Available Downloads:

MARS-Datasheet-TB-Recirculation.pdf
Popular 464.18 KB 85
30/08/2018 16:51:14
MARS-Datasheet-TB.pdf
Popular 488.9 KB 121
30/08/2018 16:19:23
MARS-PR-C715-Compliance.pdf
Popular 1.32 MB 20
23/10/2018 15:32:19
MARS-PR-C715UpgradeProgram-Nov-2018.pdf
Popular 1.33 MB 8
27/11/2018 00:00:00
MARS-PR-M3-Scale-Upgrade.pdf
Popular 1.35 MB 38
29/08/2018 01:36:47
MARS-PR-M3-Scale.pdf
Popular 604.02 KB 44
29/08/2018 04:53:44
MARS-PR-MCC.pdf
Popular 688.64 KB 47
29/08/2018 04:53:53
MARS-PR-TB-Patent-ULF.pdf
Popular 612.87 KB 37
29/08/2018 04:54:02
MARS-PR-TB-ULF-BF.pdf
Popular 632.89 KB 41
29/08/2018 04:54:10
MARS-PR-TestBenchPurchaseProtectionProgram-Nov-2018.pdf
Popular 1.32 MB 8
27/11/2018 00:00:00